
















The YMLED-6247 is a high-performance solar LED lawn light engineered for landscape pathways, residential gardens, parks, villas, and commercial outdoor environments. Designed with a focus on durability, efficiency, and modern aesthetics, it provides a fully autonomous “zero-wiring” lighting solution for outdoor decorative and functional applications
The system integrates a high-efficiency monocrystalline solar panel, long-life lithium battery, and intelligent charge-discharge controller to ensure stable illumination throughout the night. Its optimized optical structure delivers uniform light distribution with soft glare control, enhancing safety and visual comfort in pedestrian areas. The lamp body is constructed from die-cast aluminum with a corrosion-resistant structure design. The surface is treated with UV-resistant polyester powder coating, supporting RAL color customization to match various landscape styles. With an IP66-rated waterproof structure and strong impact resistance, it ensures reliable operation in outdoor environments exposed to rain, humidity, dust, and temperature fluctuations.
Equipped with automatic dusk-to-dawn operation and optional motion-sensing control, the YMLED-6247 maximizes energy utilization while extending battery lifespan. Its modular internal layout simplifies maintenance and ensures long-term performance stability. The product is ideal for eco-friendly landscape lighting projects requiring high reliability, low maintenance, and sustainable energy solutions.
CRI Colour Rendering Index: 80
LED Chips: Philips 5050
CCT: 2200K-6500K
RAL finish on request; anti-UV polyester powder coating surface, salt spray resistance over 1,000 hours
Body Material: Die-cast aluminium,6063-T5
Useful life > 50,000h (Ta= 25°C)
Waterproof Protection rating: IP66 IK09
Operating temperature: -30°C to +50°C.
Net weight: 8.3/7.3 (kgs)
Product description:
| Product Code | Rated Power | Solar panel power | Battery parameters | LED Qty | Luminous Flux | G.W/N.W (kgs) | Packing Size |
| YMLED-6247 | 5W | 20W | 3.2V 40AH | 4 | 660 | 8.3/7.3 | 1020x300x180mm |
![]() |
![]() |
![]() |
| Material: PC
Angle: TYPE2
Chip: 5050 3030×4 7070
Size: 50×50
Order Code: 3292
|
Material: PC
Angle: TYPE3
Chip: 5050 3030×4 7070
Size: 50×50
Order Code: 3293
|
Material: PC
Angle: TYPE4
Chip: 5050 3030×4 7070
Size: 50×50
Order Code: 3294
|
![]() |
![]() |
|
| Material: PC
Angle: TYPE5
Chip: 5050 3030×4 7070
Size: 50×50
Order Code: 3295
|
Material: PC
Angle: 100×160
Chip: 5050 3030×4 7070
Size: 50×50
Order Code: 2581
|
RAL and Height finish on request
Samples: Typically 7 working days.
Bulk Orders: Approximately 14-21 working days after receiving the deposit and confirming all specifications.
We accept payments in USD via T/T. The standard terms are:
30% deposit before production, 70% balance before shipment.
For orders below $1000 USD, full payment (100%) is required via T/T.
Our quotations are typically based on EXW or FOB trade terms.
Yes, we offer professional OEM/ODM customization services to meet specific requirements in product design, performance, and packaging.
With extensive experience in non-standard customized products, our engineering team is able to provide technical solutions and initial feedback within 12 hours.
Standard packaging includes brown outer cartons and brown inner boxes.
For orders of any quantity, we offer customization services, including: Laser-engraved logos on the lamp body. Custom-designed color boxes and cartons with your logo.
Considering that most of our customers are involved in engineering projects, we don't have an MOQ.
Our products comply with international standards, with CE and RoHS certifications for all categories. Some of the garden lights and street lamps also have ETL and ENEC certifications.
When a landscape architect or municipal engineer opens a lighting package and sees a note that says...
READ MOREMost commercial LED outdoor lighting failures have nothing to do with the LED chip. A row of bollar...
READ MOREA specifier sends the same request for 200 roadway luminaires to three suppliers and receives three...
READ MOREA 14 unit townhouse complex left its rear service alley unlit for years, and the same three doors w...
READ MOREA road inside an industrial park has no grid connection, yet the site needs 12 hours of reliable li...
READ MOREWhen a lighting specifier points to a fixture on a pole and says “that mounting,” they are usually ...
READ MORE